Showing posts with label concealed nail roofing. Show all posts
Showing posts with label concealed nail roofing. Show all posts

Thursday, February 14, 2013

How To Install Roll Roofing

Roll roofing comes in a variety of colors. It's a heavyweight composition roofing material that can be used on low-pitch roofs- down to a 1 in 12 slope with the concealed-nail method. This makes it useful on roofs where nothing else will work.

Roll roofing can crack in cold weather, so don't apply it when it's below 45 degrees F. To finish a job after the weather turns colsd store the rolls in a warm area prior to application.

Exposed- Nail Application
Apply roll roofing over a smooth deck, allowing a1/2 inch overhang along the eaves. Cut is flush with the rake edges and nail on a metal drip edge with galvanized roofing nails, 3/4 inch from the edge. Cover valleys with 18 inch-wide strips of roll roofing. Nail one side every 6 inches. Completely seat the strip in the valley and nail the other side.

Snap a chalk line across the roof 35.5 inches from the eaves to align the first course. Position the roll and nail it every 2 feet along the top. Put nails 3 inches apart at the rake and eave edges. If one sheet doesn't cover the roof, overlap the next piece by 6 inches. Nail the bottom section , apply roofing cement, then nail the ovelap in place.

Snap a chalk line 34 inches from the top edge of the first strip as a guide for the next one. Tack the upper edge of the seconf strip. Then spread a 2-inch-wide layer of roofing cement along the upper edge of the first strip and nail the seconf course over it.

If succeeding courser must be end-lapped, stagger the joints so that they are not directly above each other.